Auto-suggested mappings — adjust as needed before previewing.
Sheet: 2024_PROJECTS_UPDATE_BLAZE
41 columns · 21 mapped · 20 ignored
Source column
Maps to
Confidence
Ignore
ACCESSORIES/ADDERS
—
Address
100%
CONTRACT PRICE
—
CONTRACT SIGNED DATE
—
COUNTY
100%
CUSTOMER NAME
100%
DESIGNS STATUS
—
DROPBOX LINK FOR DOCS
—
EMAIL
100%
HOA
—
HOI
—
INSPECTION DATE
100%
INSPECTION STATUS
100%
INSTALL DATE
—
INTERCONNECTION STATUS
100%
INVERTER
100%
LOAN TYPE
100%
MEA
—
METER CHANGE
100%
MODULES
86%
MONITORING
—
MPU/SE/RELOCATION
—
NTP
—
NTP NOTES
56%
No of Modules
—
PEARL CERTIFICATION
—
PERMIT STATUS
100%
PHONE
100%
PROJECT STATUS
100%
PTO
100%
ROOF TYPE
—
ROOFING - Y/N
—
SALES OFFICE
100%
SALES REP
100%
SALES REP EMAIL
60%
SREC
—
SYSTEM ACTIVATION
—
SYSTEM SIZE/kw
100%
TECH - QA NOTES
—
TECH - QA STATUS
—
UTILITY COMPANY
100%
Sheet: 2025_PROJECTS_UPDATED_BLAZE
59 columns · 24 mapped · 35 ignored
Source column
Maps to
Confidence
Ignore
ACCESSORIES/ADDERS
—
Blaze Update
—
CONTRACT PRICE
—
CONTRACT SIGNED DATE
—
COUNTY
100%
CUSTOMER NAME
100%
DESIGNS STATUS
—
DROPBOX LINK FOR DOCS
—
EMAIL
100%
HOA NOTES
56%
HOA STATUS
60%
HOI
—
INSPECTION DATE
100%
INSPECTION STATUS
100%
INSTALL DATE
—
INSTALL NOTES
—
INTERCONNECTION NOTES
100%
INTERCONNECTION STATUS
100%
INVERTER
100%
LOAN TYPE
100%
METER CHANGE
100%
MODULES
86%
MONITORING
—
MPU/SE/RELOCATION
—
MSAP
—
NTP
—
NTP NOTES
56%
No of Modules
—
PEARL CERTIFICATION
—
PERMIT NOTES
100%
PERMIT STATUS
100%
PHONE
100%
PTO
100%
ROOF TYPE
—
ROOFING - Y/N
—
SALES OFFICE
100%
SALES REP
100%
SALES REP EMAIL
60%
SALES REP EMAIL (2)
—
SITE SURVEY DATE
—
SREC
—
STATUS
100%
SYSTEM ACTIVATION
—
SYSTEM SIZE/kw
100%
TECH - QA NOTES
—
UTILITY COMPANY
100%
Unknown (10)
—
Unknown (11)
—
Unknown (12)
—
Unknown (13)
—
Unknown (2)
—
Unknown (3)
—
Unknown (4)
—
Unknown (5)
—
Unknown (6)
—
Unknown (7)
—
Unknown (8)
—
Unknown (9)
—
current phase
—
Sheet: 2026_PROJECTS_UPDATES
49 columns · 28 mapped · 21 ignored
Source column
Maps to
Confidence
Ignore
ACCESSORIES/ADDERS
—
CONTRACT PRICE
—
CONTRACT SIGNED DATE
—
COUNTY
100%
CUSTOMER NAME
100%
DESIGNS STATUS
—
DROPBOX LINK FOR DOCS
—
EMAIL
100%
HOA NOTES
56%
HOA STATUA
—
HOI
—
INSPECTION DATE
100%
INSPECTION STATUS
100%
INSTALL DATE
—
INSTALL NOTES
—
INTERCONNECTION NOTES
100%
INTERCONNECTION STATUS
100%
INVERTER
100%
INVERTER MODEL
100%
LOAN TYPE
100%
METER CHANGE
100%
MODULE
100%
MONITORING
—
MPU/SE/RELOCATION
—
MSAP
—
NTP
—
NTP NOTES
56%
No of Modules
—
PEARL CERTIFICATION
—
PERMIT NOTES
100%
PERMIT STATUS
100%
PHONE
100%
PTO
100%
ROOF TYPE
—
ROOFING - Y/N
—
SALES OFFICE
100%
SALES REP
100%
SALES REP EMAIL
60%
SITE SURVEY DATE
—
SREC
—
STATE
100%
STATUS
100%
STREET
100%
SYSTEM ACTIVATION
—
SYSTEM SIZE/kw
100%
TECH - QA NOTES
—
TOWN
100%
UTILITY COMPANY
100%
ZIPCODE
100%
Sheet: Anmol PTO
6 columns · 2 mapped · 4 ignored
Source column
Maps to
Confidence
Ignore
Finance type
100%
Install date
—
PTO Status
100%
Project name
—
Sales Dealer
—
Sr. No.
—
Sheet: Anmols List
49 columns · 24 mapped · 25 ignored
Source column
Maps to
Confidence
Ignore
ACCESSORIES/ADDERS
—
Blaze Update
—
CONTRACT PRICE
—
CONTRACT SIGNED DATE
—
COUNTY
100%
CUSTOMER NAME
100%
DESIGNS STATUS
—
DROPBOX LINK FOR DOCS
—
EMAIL
100%
HOA NOTES
56%
HOA STATUS
60%
HOI
—
INSPECTION DATE
100%
INSPECTION STATUS
100%
INSTALL DATE
—
INSTALL NOTES
—
INTERCONNECTION NOTES
100%
INTERCONNECTION STATUS
100%
INVERTER
100%
LOAN TYPE
100%
METER CHANGE
100%
MODULES
86%
MONITORING
—
MPU/SE/RELOCATION
—
MSAP
—
NTP
—
NTP NOTES
56%
No of Modules
—
PEARL CERTIFICATION
—
PERMIT NOTES
100%
PERMIT STATUS
100%
PHONE
100%
PTO
100%
ROOF TYPE
—
ROOFING - Y/N
—
SALES OFFICE
100%
SALES REP
100%
SALES REP EMAIL
60%
SALES REP EMAIL (2)
—
SITE SURVEY DATE
—
SREC
—
STATUS
100%
SYSTEM ACTIVATION
—
SYSTEM SIZE/kw
100%
TECH - QA NOTES
—
UTILITY COMPANY
100%
Unknown (2)
—
Unknown (3)
—
current phase
—
Sheet: CP Rejection for SN Retrofit pr
5 columns · 2 mapped · 3 ignored
Source column
Maps to
Confidence
Ignore
Address
100%
CP Status(Rejection Comment)
—
Customer Name
100%
FDA Status (Rejection Comment)
—
Serial Number
—
Sheet: CR Deep
14 columns · 2 mapped · 12 ignored
Source column
Maps to
Confidence
Ignore
Adders
—
Adjustments/Processing fee
—
Customer Name
100%
M1
—
M1 (2)
—
M2
—
M2 (2)
—
M3
—
M3 (2)
—
PPW
—
Sr. No.
—
System Cost
—
System Size
100%
Total system cost after adders
—
Sheet: Cancelled 2025
46 columns · 23 mapped · 23 ignored
Source column
Maps to
Confidence
Ignore
ACCESSORIES/ADDERS
—
ADDRESS
100%
CONTRACT PRICE
—
CONTRACT SIGNED DATE
—
COUNTY
100%
CUSTOMER NAME
100%
DESIGNS STATUS
—
DROPBOX LINK FOR DOCS
—
EMAIL
100%
HOA
—
HOA NOTES
56%
HOI
—
INSPECTION DATE
100%
INSPECTION STATUS
100%
INSTALL DATE
—
INSTALL NOTES
—
INTERCONNECTION NOTES
100%
INTERCONNECTION STATUS
100%
INVERTER
100%
LOAN TYPE
100%
MEA
—
METER CHANGE
100%
MODULES
86%
MONITORING
—
MPU/SE/RELOCATION
—
NTP
—
NTP NOTES
56%
No of Modules
—
PEARL CERTIFICATION
—
PERMIT STATUS
100%
PHONE
100%
PTO
100%
ROOF TYPE
—
ROOFING - Y/N
—
SALES OFFICE
100%
SALES REP
100%
SALES REP EMAIL
60%
SITE SURVEY DATE
—
SREC
—
STATUS
100%
SYSTEM ACTIVATION
—
SYSTEM SIZE/kw
100%
TECH - QA NOTES
—
TECH - QA STATUS
—
UTILITY COMPANY
100%
Unknown (2)
—
Sheet: DO NOT EDIT
59 columns · 23 mapped · 36 ignored
Source column
Maps to
Confidence
Ignore
ACCESSORIES/ADDERS
—
ADDRESS
100%
Blaze Update
—
CONTRACT PRICE
—
CONTRACT SIGNED DATE
—
COUNTY
100%
CUSTOMER NAME
100%
DESIGNS STATUS
—
DROPBOX LINK FOR DOCS
—
EMAIL
100%
HOA NOTES
56%
HOA STATUA
—
HOI
—
INSPECTION DATE
100%
INSPECTION STATUS
100%
INSTALL DATE
—
INSTALL NOTES
—
INTERCONNECTION NOTES
100%
INTERCONNECTION STATUS
100%
INVERTER
100%
LOAN TYPE
100%
METER CHANGE
100%
MODULES
86%
MONITORING
—
MPU/SE/RELOCATION
—
MSAP
—
NTP
—
NTP NOTES
56%
No of Modules
—
PEARL CERTIFICATION
—
PERMIT NOTES
100%
PERMIT STATUS
100%
PHONE
100%
PTO
100%
ROOFING - Y/N
—
SALES OFFICE
100%
SALES REP
100%
SALES REP EMAIL
60%
SITE SURVEY DATE
—
SREC
—
SYSTEM ACTIVATION
—
SYSTEM SIZE/kw
100%
TECH - QA NOTES
—
UTILITY COMPANY
100%
Unknown (10)
—
Unknown (11)
—
Unknown (12)
—
Unknown (13)
—
Unknown (14)
—
Unknown (2)
—
Unknown (3)
—
Unknown (4)
—
Unknown (5)
—
Unknown (6)
—
Unknown (7)
—
Unknown (8)
—
Unknown (9)
—
current phase
—
tangie
—
Sheet: DR. SOLAR
45 columns · 23 mapped · 22 ignored
Source column
Maps to
Confidence
Ignore
ACCESSORIES/ADDERS
—
ADDRESS
100%
CONTRACT PRICE
—
CONTRACT SIGNED DATE
—
COUNTY
100%
CUSTOMER NAME
100%
DESIGNS STATUS
—
DROPBOX LINK FOR DOCS
—
EMAIL
100%
HOA NOTES
56%
HOA STATUA
—
HOI
—
INSPECTION DATE
100%
INSPECTION STATUS
100%
INSTALL DATE
—
INSTALL NOTES
—
INTERCONNECTION NOTES
100%
INTERCONNECTION STATUS
100%
INVERTER
100%
LOAN TYPE
100%
MEA
—
METER CHANGE
100%
MODULES
86%
MONITORING
—
MPU/SE/RELOCATION
—
NTP
—
NTP NOTES
56%
No of Modules
—
PEARL CERTIFICATION
—
PERMIT NOTES
100%
PERMIT STATUS
100%
PHONE
100%
PTO
100%
ROOF TYPE
—
ROOFING - Y/N
—
SALES OFFICE
100%
SALES REP
100%
SALES REP EMAIL
60%
SITE SURVEY DATE
—
SREC
—
SYSTEM ACTIVATION
—
SYSTEM SIZE/kw
100%
TECH - QA NOTES
—
UTILITY COMPANY
100%
Unknown (2)
—
Sheet: For Megan
10 columns · 5 mapped · 5 ignored
Source column
Maps to
Confidence
Ignore
CUSTOMER NAME
100%
INSPECTION STATUS
100%
INSTALL DATE
—
PTO
100%
Pending
—
Received
67%
S.NO
—
SYSTEM SIZE/kw
100%
Sales Dealer
—
Total Contract Amount
—
Sheet: For Megan - PTO pending sheet
8 columns · 1 mapped · 7 ignored
Source column
Maps to
Confidence
Ignore
Finance type
100%
PTO Status and Issuance Date
—
Project name
—
Reason for delay
—
Remaining EPC amount
—
Sales Dealer
—
Sr. No.
—
Unknown (2)
—
Sheet: Fully Paid Invoices
25 columns · 0 mapped · 25 ignored
Source column
Maps to
Confidence
Ignore
/
—
Amir Etesam
—
As of now, the inspection is completed and Cici requested to shared the fully paid invoice
—
One Ethos
—
Tue Dec 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time)
—
Unknown (10)
—
Unknown (11)
—
Unknown (12)
—
Unknown (13)
—
Unknown (14)
—
Unknown (15)
—
Unknown (16)
—
Unknown (17)
—
Unknown (18)
—
Unknown (19)
—
Unknown (2)
—
Unknown (20)
—
Unknown (21)
—
Unknown (3)
—
Unknown (4)
—
Unknown (5)
—
Unknown (6)
—
Unknown (7)
—
Unknown (8)
—
Unknown (9)
—
Sheet: Housing Unlimited
12 columns · 9 mapped · 3 ignored
Source column
Maps to
Confidence
Ignore
Address
100%
Approved Date
100%
DC Size
57%
House Numbers
—
Inspection
100%
Installation
60%
Interconnection Status
100%
Meter Change
100%
PTO Date
100%
Permits
86%
Project ID
—
Unknown (2)
—
Sheet: IGS_RAJNEESH
15 columns · 6 mapped · 9 ignored
Source column
Maps to
Confidence
Ignore
CHANGE ORDER STATUS
—
CUSTOMER FACING?
—
CUSTOMER NAME
100%
DESIGN
—
Dropbox Link
—
INTERCONNECTION
100%
Interconnection Status
100%
NEW PRODUCTION
—
NEW SPECS - SAME FOR ALL
—
NEW SYSTEM SIZE
73%
OLD PRODUCTION
—
OLD SPECS
—
OLD SYSTEM SIZE
73%
PERMIT
100%
Unknown (2)
—
Sheet: IGS_WORK IN PROGRESS
47 columns · 23 mapped · 24 ignored
Source column
Maps to
Confidence
Ignore
ACCESSORIES/ADDERS
—
ADDRESS
100%
Blaze Update
—
CONTRACT PRICE
—
CONTRACT SIGNED DATE
—
COUNTY
100%
CUSTOMER NAME
100%
DESIGNS STATUS
—
DROPBOX LINK FOR DOCS
—
EMAIL
100%
HOA NOTES
56%
HOA STATUA
—
HOI
—
INSPECTION DATE
100%
INSPECTION STATUS
100%
INSTALL DATE
—
INSTALL NOTES
—
INTERCONNECTION NOTES
100%
INTERCONNECTION STATUS
100%
INVERTER
100%
LOAN TYPE
100%
METER CHANGE
100%
MODULES
86%
MONITORING
—
MPU/SE/RELOCATION
—
MSAP
—
NTP
—
NTP NOTES
56%
No of Modules
—
PEARL CERTIFICATION
—
PERMIT NOTES
100%
PERMIT STATUS
100%
PHONE
100%
PTO
100%
ROOF TYPE
—
ROOFING - Y/N
—
SALES OFFICE
100%
SALES REP
100%
SALES REP EMAIL
60%
SITE SURVEY DATE
—
SREC
—
SYSTEM ACTIVATION
—
SYSTEM SIZE/kw
100%
TECH - QA NOTES
—
UTILITY COMPANY
100%
Unknown (2)
—
current phase
—
Sheet: Installation Schedule
13 columns · 9 mapped · 4 ignored
Source column
Maps to
Confidence
Ignore
AHJ
100%
Address
100%
Comments
100%
Date
67%
Day
—
Domestic Content
—
Inverter Type
100%
Lender
—
Modules
86%
Name
100%
Status
100%
System Size
100%
Tech QA notes
—
Sheet: NUSUN DEALS
6 columns · 3 mapped · 3 ignored
Source column
Maps to
Confidence
Ignore
ADDRESS
100%
CUSTOMER NAME
100%
S NO
—
STATUS
100%
SURVEY DATE
—
SUVREY TIME
—
Sheet: OLD CUSTOMERS_DATABASE
15 columns · 5 mapped · 10 ignored
Source column
Maps to
Confidence
Ignore
Address
100%
City
100%
Contact
—
Email
100%
Inverter
100%
Manufacturer
—
Model
—
Name
100%
Region
—
System Cost
—
Unknown (2)
—
Unknown (3)
—
Unknown (4)
—
Unknown (5)
—
Year Installa
—
Sheet: Operations Schedule
7 columns · 6 mapped · 1 ignored
Source column
Maps to
Confidence
Ignore
AHJ
100%
Address
100%
Comments
100%
Customer
100%
Date
67%
Status
100%
Visit Type
—
Sheet: PA projects
46 columns · 9 mapped · 37 ignored
Source column
Maps to
Confidence
Ignore
Acc / W.O Num.
—
Address
100%
City/County
—
Info/Dealer
—
Inspection
100%
Int - App - fee
—
Int - Issues
60%
Int - Part 1
—
Int - Part 2
—
Inverter
100%
NOTES
100%
Name
100%
Status
100%
System Size
100%
Unknown (10)
—
Unknown (11)
—
Unknown (12)
—
Unknown (13)
—
Unknown (14)
—
Unknown (15)
—
Unknown (16)
—
Unknown (17)
—
Unknown (18)
—
Unknown (19)
—
Unknown (2)
—
Unknown (20)
—
Unknown (21)
—
Unknown (22)
—
Unknown (23)
—
Unknown (24)
—
Unknown (25)
—
Unknown (26)
—
Unknown (27)
—
Unknown (28)
—
Unknown (29)
—
Unknown (3)
—
Unknown (30)
—
Unknown (31)
—
Unknown (4)
—
Unknown (5)
—
Unknown (6)
—
Unknown (7)
—
Unknown (8)
—
Unknown (9)
—
Utility
100%
`
—
Sheet: PG County
25 columns · 2 mapped · 23 ignored
Source column
Maps to
Confidence
Ignore
1e
—
B-Permit No
—
Customer Name
100%
Electrical Permit
—
MPU permit-Application No
—
MPU-Permit No
—
MPU-Permits
—
Status
100%
Unknown (10)
—
Unknown (11)
—
Unknown (12)
—
Unknown (13)
—
Unknown (14)
—
Unknown (15)
—
Unknown (16)
—
Unknown (2)
—
Unknown (3)
—
Unknown (4)
—
Unknown (5)
—
Unknown (6)
—
Unknown (7)
—
Unknown (8)
—
Unknown (9)
—
e
—
f
—
Sheet: Projects in Pipeline
9 columns · 8 mapped · 1 ignored
Source column
Maps to
Confidence
Ignore
Address
100%
Customer Name
100%
INVERTER
100%
LOAN TYPE
100%
MODULES
86%
No of Modules
—
SALES OFFICE
100%
SYSTEM SIZE/kw
100%
Status
100%
Sheet: Roofing
8 columns · 1 mapped · 7 ignored
Source column
Maps to
Confidence
Ignore
Address
100%
Project name
—
SQ FT
—
Squares
—
Type of roof
—
Unknown (2)
—
Unknown (3)
—
Unknown (4)
—
Sheet: Sheet331
43 columns · 3 mapped · 40 ignored
Source column
Maps to
Confidence
Ignore
(240)-392-5555
—
13.76
—
200 Amps. Need LST
—
200 Amps. Need LST Notes / Additional Work - Exsiting solar system - An existing solar system is already installed at the site. To integrate the new system with Enphase components, a new combiner box must be added. Ensure the new combiner box is installed at least 15 feet in front of the existing combiner box to maintain proper spacing and system compatibility.